ProPlatr

Your plating shop’s quality system. Finally.

Log baths. Track defects. Close corrective actions. All connected — from the lab bench to the quality report.

Start Free

Already have an account? Log In

Free forever · No credit card · Built for platers

UCLLCL
Bath Out of Spec
Defect Logged
CA Created
RCA Completed
Closed

Most plating shops track quality in spreadsheets. Or worse — notebooks.

Lost paper trails

CA forms buried in a filing cabinet no one opens.

No SPC visibility

Bath parameters drift before anyone notices.

Disconnected records

Defects, CAs, and lab results in three different places.

Audit scrambles

Days spent reconstructing records for ISO or AS9100.

No follow-through

Corrective actions opened. Never closed.

One person knows everything

And they just gave notice.

One connected quality loop.

From the moment a bath drifts to the moment the corrective action closes — every step is linked.

Lab Analysis
Log bath parameters and lab results.
Out-of-Spec Alert
Automatic detection when a value breaches control limits.
Defect Log
Tie the defect to a specific line, tank, and bath.
Corrective Action
Launch a CA and assign ownership in one click.
Root Cause Analysis
Guided 5 Whys, Fishbone, or 8D methodology.
Verified & Closed
Evidence-based closure with audit trail.
Follow-Up
Scheduled verification to prevent recurrence.

SPC & Bath Monitoring

Know the moment a bath drifts. Western Electric Rules detect special cause variation before it becomes a defect.

Nickel Bath #2 — Concentration (oz/gal)Last 14 days
UCLLCL
Log Defect

Connected Defect Log

Every defect is a link in the chain. Log it from the lab, tie it to a line and tank, and launch a corrective action in one click.

DEFECT #D-0047
MAJORPitting on Rack 3 — Nickel Line
Lab Result:LR-0312 — pH 3.2 (low)
Corrective Action:CA-0089 — Open
Line / Tank:Line 2 / Tank 7

RCA That Actually Gets Done

Guide your team through 5 Whys, Fishbone, or 8D — then export a professional PDF report. Quality managers love this.

Select Methodology
5 Whys
Complete Analysis
Root cause identified
Export PDF Report
proplatr-CA-0089.pdf

Quality Dashboard

CA aging. Defect rates by line. Out-of-spec frequency. All in one place. Know your shop's quality posture at a glance.

0
Open CAs
0
Avg Cycle Time
0
Defects This Month
0
On-Time Close Rate

Sales Pipeline & CRM

Track every prospect from first call to closed deal. Log quotes, schedule follow-ups, and set revenue targets — so nothing slips through the cracks while you're running the lab.

SALES PIPELINEPro
Prospect8
Quoted3
Closed Won5
Lost2
Quote #Q-041 sent to Henning Group — $2,400
Follow-up scheduled: Quick Turn Anodizing — Thu

Simple pricing. No surprises.

Start free. Upgrade when you need the full quality system.

Free

$0/mo

Everything you need to get started.

  • Plating calculators
  • Process troubleshooting guides
  • Periodic table reference
  • Knowledge quiz with badges
  • Personal notes
  • Shop floor task list
Start Free
Built for Quality

Pro

$3.99/mo

The full quality system. Billed monthly, cancel anytime.

  • Everything in Free
  • Lab results + SPC charting
  • Line builder with tank mapping
  • Defect log with traceability
  • Corrective actions + RCA
  • Quality dashboard + exports
  • PDF reports
  • CRM with customer tracking
  • Shift handover log
Start Pro Trial

Built by people who’ve stood at the tank.

Quality Standards

Designed around ISO 9001 and AS9100D quality management workflows.

Statistical Process Control

SPC charting built on Western Electric Rules — the same standard used by automotive OEMs.

Industry Methodology

Corrective action workflows following 8D methodology — Ford's standard since 1987.

The plating shops that win on quality don’t use spreadsheets.

Set up in minutes. No IT required. Cancel anytime.